LEED Practice Exam

Descrição

Quiz sobre LEED Practice Exam, criado por Medora Pepper em 21-04-2016.
Medora Pepper
Quiz por Medora Pepper, atualizado more than 1 year ago
Medora Pepper
Criado por Medora Pepper mais de 8 anos atrás
50
1

Resumo de Recurso

Questão 1

Questão
If a LEED project that is providing preferred parking for fuel efficient and low emitting vehicles has multiple parking lots, where should the preferred parking spaces be located?
Responda
  • preferred parking spaces only need to be provided in one lot
  • preferred parking spaces only need to be located in the lot designated for visitors
  • preferred parking spaces only need to be provided in the lot designated for staff
  • preferred parking spaces must be distributed among all lots

Questão 2

Questão
Which LEED recognized strategy will require chain of custody documentation as proof of credit compliance?
Responda
  • certified wood
  • rapidly renewable resources
  • recycled materials
  • regional materials
  • materials reuse

Questão 3

Questão
What is the greatest benefit of an integrative design process as it relates to a LEED project?
Responda
  • educating the project owner
  • reducing project soft costs
  • meeting building codes
  • shortening the project schedule
  • capitalizing on credit synergies

Questão 4

Questão
How many years can an agricultural product grow or be raised to be considered as rapidly renewable by LEED?
Responda
  • 10
  • 15
  • 20
  • 5

Questão 5

Questão
Which of the following strategies does not qualify as providing "preferred parking"?
Responda
  • providing a space that is as close to the building as possible
  • providing a designated covered spot
  • offering a significant discount on parking passes
  • providing a guaranteed space in a lottery system
  • providing a randomly assigned parking space

Questão 6

Questão
When are CFC based refrigerants allowed to be used in a LEED project?
Responda
  • if a CFC phase out is economically infeasible
  • if the refrigerant leakage rate is below 10% annually
  • in existing buildings
  • anytime

Questão 7

Questão
Which of the following is not a required design consideration for the recycling collection and storage area prerequisite?
Responda
  • protection from the elements
  • collection truck access
  • appropriate signage
  • convenient location

Questão 8

Questão
A project team is using cotton insulation that is grown and manufactured 100 miles from the project site. What credit(s) will the use of this material count toward?
Responda
  • rapidly renewable materials
  • recycled content
  • regional materials
  • recycled content and regional materials
  • rapidly renewable materials and regional materials

Questão 9

Questão
Which of the following project is considered to be a "soft cost"?
Responda
  • the architect's fees
  • carpet
  • money paid to the brick mason for labor
  • the project's structural steel
  • landscaping costs

Questão 10

Questão
What is required as documentation for each and every prerequisite and credit in the LEED for BUilding Designa nd Construction Rating System?
Responda
  • a project drawings
  • a required signatory
  • a letter template
  • photos
  • a project narrative

Questão 11

Questão
What is the minimum amount of pervious area a paving system must have to be considered "open grid"?
Responda
  • 40%
  • 50%
  • 30%
  • 60%
  • 20%

Questão 12

Questão
Solar reflectance is roughly synonymous with what term?
Responda
  • aquifer
  • glare
  • shielding
  • albedo
  • lumen

Questão 13

Questão
Which of the following is not considered to be a "basic service"?
Responda
  • Parking lot
  • church
  • bank
  • beauty salon
  • grocery store

Questão 14

Questão
One of the most cost effective ways to ensure optimal ongoing energy performance is to ______?
Responda
  • commission building systems
  • upgrade mechanical systems
  • maintain trees and landscaping features
  • install renewable energy systems

Questão 15

Questão
Which federal act has been adopted by many local jurisdictions and contains requirements for building accessibility?
Responda
  • EPAct
  • ANSI
  • ADA
  • Civil Rights Act
  • ASHRAE

Questão 16

Questão
A project generates 100 tons of waste throughout construction. 50 tons are collected off site and sent to a sorting facility with a facility wide diversion rate of 60%. 40 tons are separated on site and sent directly to recyclers. The final 10 tons are incinerated off site. What percentage of waste does LEED consider to have been recycled?
Responda
  • 40%
  • 50%
  • 80%
  • 70%

Questão 17

Questão
Which specific refrigerant has the highest global warming potential (GWP) of all the common refrigerants?
Responda
  • HCFC-123
  • CFC-502
  • CFC-11
  • HFC-404A
  • HFC-23

Questão 18

Questão
A project team is considering pursuing an innovation in design credit for a strategy that will require a large capital expense. The team decides that it will implement the strategy only if the strategy will be eligible for an innovation in design credit. What steps should the team take to determine whether its strategy will be eligible for the credit?
Responda
  • Research existing CIRs to see whether the strategy has been previously addressed
  • Draft a compelling narrative for the LEED submittal
  • Calculate the strategy's overall environmental impact and self evaluate whether it is significant
  • Check the LEED rating system

Questão 19

Questão
Which strategy supports improved indoor air quality?
Responda
  • avoid the use of products with high carbon dioxide concentrations
  • use filters with a low minimum efficiency reporting value (MERV) rating
  • use materials with recycled content
  • design systems to deliver ample outside air
  • eliminate refrigerants with ozone depletion potential
  • use advanced framing techniques

Questão 20

Questão
A new high rise residential building should use what LEED rating system for certification?
Responda
  • LEED for New Construction
  • LEED for Homes
  • LEED for Operations and Maintenance
  • LEED for Core and Shell
  • LEED for Interior Design and Construction

Questão 21

Questão
The regional priority credits for a project are based on what?
Responda
  • The project's city
  • the project's state
  • the project's county
  • the project's zip code

Questão 22

Questão
What costing model should be used to demonstrate the true cost of sustainability strategies?
Responda
  • simple payback
  • benefit analysis
  • return on investment
  • life cycle costing

Questão 23

Questão
What is the energy policy act used for in the LEED rating systems?
Responda
  • to set indoor air quality requirements
  • to establish baseline building plumbing fixture performance
  • to establish baseline building energy performance
  • to set product VOC limits

Questão 24

Questão
What is the first step in a successful waste management policy?
Responda
  • determine the embodied energy of the product
  • specify recyclable materials
  • recycle all possible construction materials
  • reduce the total quantity of waste
  • reuse existing materials

Questão 25

Questão
What is the first step a project team should consider when trying to save energy?
Responda
  • install sub metering equipment
  • use onsite renewable energy
  • reduce energy demand
  • adopt energy efficient measures

Questão 26

Questão
What happens if USBC finds out that a project does not meet the minimum program requirements (MPRs)?
Responda
  • the project's certification level is lowered by one level
  • the project must be resubmitted
  • certification can be revoked
  • a fine must be paid

Questão 27

Questão
The heat island effect may raise the temperature in an urban area by how many degrees above the temperature in nearby rural areas?
Responda
  • 10
  • 8
  • 2
  • 6
  • 4

Questão 28

Questão
What percentage of the solid waste stream each year is attributable to construction and demolition of waste?
Responda
  • 50%
  • 20%
  • 10%
  • 40%
  • 30%

Questão 29

Questão
What factor should a project team not consider when calculating life cycle costs?
Responda
  • maintenance costs
  • operating costs
  • initial costs
  • life span
  • none of the above

Questão 30

Questão
Which of the following transportation methods does not count as public transportation for LEED purposes?
Responda
  • subway system
  • campus shuttle or school bus system
  • bus
  • elevated rail system
  • taxi

Questão 31

Questão
Use of a dry urinal would decrease the fixture's water use form the Energy Policy Act baseline urinal water usage by how much?
Responda
  • 1.6 GPF
  • 2.5 GPF
  • 0.5 GPF
  • 1.0 GPF

Questão 32

Questão
LEED defined regional materials as originating within ____ miles of the project site?
Responda
  • 500
  • 700
  • 100
  • 250

Questão 33

Questão
Projects can identify which credits have regional priority by ____?
Responda
  • Checking the USGBC website
  • researching locally pertinent environmental issues
  • calculating the net environmental impact
  • submitting a CIR

Questão 34

Questão
Which type of refrigerant has an essentially zero ozone depletion potential (ODP) but still has high global warming potential (GWP)?
Responda
  • HCFCs
  • HFCs
  • CFCs
  • natural refrigerants

Questão 35

Questão
Which of the following is not a LEED accepted strategy for decreasing single rider, conventional automobile use?
Responda
  • providing preferred parking for fuel efficient and low emitting vehicles
  • charging fees for parking
  • locating the project near mass transit
  • providing only the amount of parking required by the zoning code
  • providing bicycle storage and showers

Questão 36

Questão
A building material that is made from recycled soda bottles contains _____?
Responda
  • pre-fabricated recycled content
  • post-industrial recycled content
  • pre-consumer content
  • post-consumer recycled content

Questão 37

Questão
Which LEED category has the most available LEED points?
Responda
  • water efficiency
  • indoor environmental air quality
  • location and transportation
  • energy and atmosphere
  • sustainable sites
  • materials and resources

Questão 38

Questão
Which strategy is not effective in reducing potable water use for irrigation?
Responda
  • mulching
  • rainwater harvesting
  • drip irrigation
  • spray irrigation
  • using native or adapted plants

Questão 39

Questão
What environmental problem is associated with CFC and HCFC use?
Responda
  • soil erosion
  • ozone depletion
  • the heat island effect
  • water pollution
  • air pollution

Questão 40

Questão
Which of the following strategies would not be appropriate for mitigating the heat island effect potential of the parking lot of a large office building?
Responda
  • use paving with a SRI of 35
  • place half of the parking underground
  • use open grid paving
  • use mature trees to shade 50% of the parking lot
  • plant seedling conifers to shade the parking

Questão 41

Questão
Which of the following is not a strategy for reducing stormwater runoff volume?
Responda
  • installing a vegetated roof
  • rainwater harvesting
  • minimizing the building footprint
  • increasing impervious paving
  • using bio retention

Questão 42

Questão
Which of the following types of vehicles does not qualify as an alternative fuel vehicle for the purposes of LEED?
Responda
  • Diesel powered
  • ethanol pwered
  • hydrogen powered
  • electric powered
  • hybrid (gas-electric)

Questão 43

Questão
How many of the 110 available points in most of the rating systems are considered bonus points?
Responda
  • 10
  • 20
  • 15
  • 5

Questão 44

Questão
Why should a project team aim to significantly exceed the established threshold of a LEED credit?
Responda
  • to save the world
  • to be an overachiever
  • as a precaution against a credit being audited
  • to earn exemplary performance

Questão 45

Questão
What strategy is being used for a project design that orients windows to allow the building to be warm in the winter, stay cool in the summer and capture daylight?
Responda
  • energy simulation modeling
  • high performance mechanical systems
  • passive design concepts
  • efficiencies of scale

Questão 46

Questão
Which type of system or equipment would not be a consumer of process water?
Responda
  • dishwasher
  • cooling tower
  • domestic hot water heater
  • clothes washer
  • food steamer

Questão 47

Questão
What is one potential disadvantage of using comingled recycling as a part of a construction waste management plan?
Responda
  • It is more difficult to document than site separated recycling
  • it may be more expensive than site separated recycling
  • it takes up more site area than site separated recycling
  • it may require a greater time investment from the project team

Questão 48

Questão
The CRI green label plus certification program certifies what type of building material?
Responda
  • furniture
  • adhesives
  • wood products
  • paint
  • carpet

Questão 49

Questão
Which of the following is not an acceptable form of renewable energy under the LEED rating systems?
Responda
  • low impact hydro-electricity
  • wind turbines
  • nuclear pwoer
  • geothermal
  • photovoltaic panels

Questão 50

Questão
Which type of refrigerant in general is the most efficient?
Responda
  • HFCs
  • CFCs
  • Natural refrigerants
  • HCFCs

Questão 51

Questão
Which of the following is not required of an Innovation and design strategy?
Responda
  • it must be a strategy not already covered in the LEED rating systems
  • it must be quantifiable
  • it must be cost effective
  • it must be repeatable by other projects
  • it must be comprehensive

Questão 52

Questão
Which of the following is not an approved strategy for minimizing the non-roof heat island effect?
Responda
  • shading hardscape with photovoltaiv panels
  • placing parking underground
  • using paving materials with an SRI of 29 or higher
  • using asphalt for parking areas
  • using open grid paving

Questão 53

Questão
Which rating system has a required recertification process?
Responda
  • Operations and Maintenance
  • Homes
  • Interior Design and Construction
  • Building Design and Construction
  • Neighborhood Development

Questão 54

Questão
If a project has 1 full time employee and 6 part time employees, what is the projects full time equivalent value (FTE)?
Responda
  • 6
  • 3
  • 5
  • 7
  • 4

Questão 55

Questão
What is the best use for potable water?
Responda
  • Drinking
  • cooling towers
  • toilet flushing
  • irrigation
  • swimming pools

Questão 56

Questão
What type of plant material is most appropriate for use on a green roof?
Responda
  • annuals
  • cultivated plant species
  • native plants
  • trees and shrubs

Questão 57

Questão
Which type of water is not allowed to be used for irrigation purposes?
Responda
  • Well water
  • gray water
  • captured rain water
  • potable water
  • black water

Questão 58

Questão
What is an appropriate use of the LEED logo?
Responda
  • for a link to the website
  • by a project pursuing LEED certificaiton
  • on product packaging
  • to indicate an organization's USGBC membership

Questão 59

Questão
What is not a possible source of graywater?
Responda
  • Washing machine
  • Toilets
  • Bathroom sink
  • showers
  • drinking fountain

Questão 60

Questão
What is true of the CIR process?
Responda
  • CIRs can be submitted by anyone with a USGBC account
  • all projects must use CIRs
  • CIRs cost $220 each
  • a successful CIR can aware LEED points

Questão 61

Questão
Demand controlled ventilation is typically adjusted in response to___?
Responda
  • VOC concentrations
  • a time schedule
  • occupant requests to the building operator
  • carbon dioxide concentraions

Questão 62

Questão
What sustainability concept can xeriscaping contribute to?
Responda
  • reducing the heat island effect
  • certified wood
  • indoor air quality
  • construction waste management
  • water efficient irrigation

Questão 63

Questão
Which material below is not considered a rapidly renewable resource?
Responda
  • bamboo
  • wood
  • cork
  • silk
  • straw

Questão 64

Questão
What is the best time to incorporate an integrative approach for a building project?
Responda
  • design development
  • construction documents
  • construction
  • schematic design
  • predesign

Questão 65

Questão
Which of the following regulations is likely to be contained in zoning regulations? (pick 3)
Responda
  • landscaping regulations
  • stormwater management regulations
  • regulations on energy usage
  • open space requirements
  • parking space requirements

Questão 66

Questão
Projects that achieve a projected water savings of at least ___ are eligible for an exemplary performance ID credit in addition to earning 4 points in WE indoor water use reduction.
Responda
  • 55%
  • 40%
  • 45%
  • 50%
  • 35%

Questão 67

Questão
What are some other possible LEED certifications a project may be able to receive if it has already received LEED core and shell certification? (pick 2)
Responda
  • LEED for schools
  • LEED for new construction
  • LEED for operation and maintenance
  • LEED for Homes
  • LEED for commercial interiors

Questão 68

Questão
A fuel efficient vehicle must meet which requirement to qualify as low emission and fuel efficient vehicles?
Responda
  • green label score of 30 or more
  • green label score of 45 or more
  • green e score of 25 or more
  • green seal score of 30 or more
  • green score of 45 or more

Questão 69

Questão
Which of the following products would be considered to contain post consumer recycled content that wuold contribute to the LEED credit for recycled content?
Responda
  • plumbing pipe made from recycled plastic components
  • steel beams made from used railroad ties
  • glass tiles made from glass broken during manufacturing
  • carpet made from recycled soda bottles
  • a countertop made from newspapers

Questão 70

Questão
During construction, if permanently installed air handlers are used, what is the minimum MERV rating for the filtration media needed to achieve IEQ credit: construction IAQ management plan?
Responda
  • MERV 8
  • MERV 6
  • MERV 7
  • MERV 10
  • MERV 5
  • MERV 9

Questão 71

Questão
What 3 standards can be used to achieve EA credit 1 Optimize energy performance? (pick 3)
Responda
  • Advanced buildings benchmark
  • CBECS
  • ASHRAE 90.1-2010
  • ASHRAE 62.1-2010
  • ASHRAE advanced energy design guide

Questão 72

Questão
What may prevent pedestrian access to a community resource? (pick 3)
Responda
  • a parking lot
  • a public park
  • a freeway interchange
  • distance
  • a wall

Questão 73

Questão
Which of the following materials may not contribute to construction waste management strategies? (pick 2)
Responda
  • concrete
  • product packaging
  • scrap wood
  • asbestos floor tiles
  • land clearing debris

Questão 74

Questão
What does the construction activity pollution prevention plan aim to prevent? (pick 3)
Responda
  • carbon emissions
  • solid waste generation
  • erosion
  • airborne dust pollution
  • sedimentation
  • construction worker accidents

Questão 75

Questão
Which standards are used to establish what vehicles qualify as low emitting and fuel efficient vehicles?
Responda
  • California air resources
  • green seal standard
  • american council for an energy efficient economy green book
  • green e prodcut
  • the greenguard certification program

Questão 76

Questão
The cost of LEED certification for new construction is based on which of the following?
Responda
  • USGBC membership and project type
  • project size
  • project size and USGBC membership
  • USGBC membership
  • project size and project type
  • project type

Questão 77

Questão
What is the cost of submitting a CIR?
Responda
  • 100
  • 0
  • 220
  • 500
  • 50

Questão 78

Questão
In addition to prohibiting smoking within the building, where is it also important to prohibit smoking to reduce occupant exposure to harmful airborne chemicals? (pick 2)
Responda
  • in covered parking spaces
  • in wooded areas
  • adjacent to building air intakes
  • near building entrances

Questão 79

Questão
Which of the following groups would be considered transient occupants? (pick 2)
Responda
  • college students
  • retail customers
  • office workers
  • factory workers
  • elementary school students

Questão 80

Questão
What happens after the construction submittal?
Responda
  • the full application is ruled upon by USGBC
  • construction points are awarded
  • the design submittal
  • design and construction points are awarded

Questão 81

Questão
What types of water on a residential condo project could not be used to qualify for WE credit 1 outdoor water use reduction? (pick 2)
Responda
  • captured rainwater
  • laundry water
  • recycled waste water
  • public water, non potable
  • kitchen sink water
  • black water

Questão 82

Questão
What are the two primary benefits of using regional materials? (pick 2)
Responda
  • minimizing the impacts of transportation
  • reducing costs
  • assuring quality craftsmanship
  • supporting the local economy

Questão 83

Questão
At minimum, which of the following basic materials should a recycling program designed to meet the storage and collection of recyclables prerequisite accommodate? (pick 3)
Responda
  • glass
  • plastics
  • cardboard
  • bulbs
  • ink cartridges

Questão 84

Questão
How can a project purchase green power? pick 2
Responda
  • By purchasing green e certified RECs
  • by buying energy directly from nearby wind farm
  • through a program by the local utility company
  • by purchasing and installing solar panels

Questão 85

Questão
Which of the following projects would definitely not meet minimum program requirements?
Responda
  • 5,000 SF fire station
  • casino on a riverboat
  • a brand new elementary school
  • renovation/addition to large office building
  • temporary sports practice facility

Questão 86

Questão
What two specific types of refrigerants does the Montreal Protocol phase out the use of? pick 2
Responda
  • CFCs
  • HFCs
  • natural
  • HCFCs

Questão 87

Questão
Two primary sources of potable water:
Responda
  • private/public well
  • ocean
  • captured rainwater
  • lake or stream
  • municipal water systems

Questão 88

Questão
What are some useful strategies to achieve WE credit: outdoor water use reduction? pick 3
Responda
  • use bioswales
  • use drip irrigation
  • remove turf grass
  • implement mulching
  • create a sediment basin

Questão 89

Questão
Which approaches can be taken to achieve WE credit outdoor water use reduction? pick 3
Responda
  • avoid mulch around flower beds
  • irrigate shrubs
  • micro misters
  • irrigate with captured rain water
  • native plants
  • use only mono species

Questão 90

Questão
What are ways to reduce storm water runoff volume?
Responda
  • create retention ponds
  • impervious paving
  • slowing water run off rates
  • use high albedo roof covering
  • use smaller building footprint
  • install bioswales

Questão 91

Questão
Local codes and regulations may affect which of the following strategies? pick 2
Responda
  • purchasing green power
  • minimizing parking capacity
  • managing indoor air quality
  • construction waste management
  • use of rainwater for toilet flushing

Questão 92

Questão
What is reduced when a project uses reclaimed water in its cooling towers?
Responda
  • process water use
  • irrigation water use
  • potable water use
  • nonpotable water use
  • indoor plumbing water use

Semelhante

Forms of Business Ownership Quiz
Noah Swanson
Unit 3 Business Studies
Lauren Thrower
Contract Law
sherhui94
AQA Business Unit 1
lauren_binney
Digital Marketing Strategy - The Essentials
Micheal Heffernan
What is Marketing?
Stephanie Natasha
Chapter 18 - Marketing mix(Product & Price)
irene floriane
Market Segementation
Noah Swanson
Business Studies - AQA - GCSE - Business Studies Key Terms
Josh Anderson
Business Marketing
s1500782
3. Enterprise, business growth and size
shlokashetty98