Questão | Responda |
Maintenance personnel are broadly classified as ___ or multiskilled. | Specialist |
Maintenance-personnel jobs are defined by the specific job titles and numbers in the ___ | (SOC) Standard Occupational Classification |
___ maintenance is scheduled work required to keep equipment in peak operating condition. | Preventive |
A ___ order is a document that details specific maintenance task to be completed. | Work |
___ maintenance is work that is planed and scheduled for completion. | Scheduled |
___ work is repair of a known problem before a breakdown occurs. | Corrective |
T or F A plant survey can use data from the preventive maintenance system to create a master equipment file | True |
T or F Electronic Files are becoming more popular for storing maintenance information, as they are easy to store, organize, and access. | True |
___ control is the organization and management of commonly used parts. vendors and suppliers, and purchasing records in the preventive maintenance system. | Inventory |
A(n) ___ is a book or electronic file that documents all work preformed during a shift and list information needed to complete work my maintenance technicians on other shifts. | Logbook |
Vibration frequency is most commonly expressed in ___. | CPM |
___ is the use of temperature-indicating or -measuring devices to quantify temperature or temperature changes. | Thermometry |
___ analysis is analysis that detects high-frequency vibration to create an image or reading. | Ultrasonic |
___ principles are based on the goal of gradual, continuous improvement in all aspects of plant operations. | Leed |
A(n) ___ is a sequence of operations that accomplishes desired results. | Process |
A(n) ___ is a diagram that shows a logical sequence of troubleshooting steps for a given set of conditions. | Flow chart |
___ skills are strategies and actions that allow an individual to communicate effectively with other persons in a variety of situation. | Interpersonal |
T or F Successful maintenance personnel practice lifelong learning. | True |
T or F An energy audit is a comprehensive review of a facility's energy use and a report on ways to reduce the energy use through changes to buildings, equipment, procedures. | True |
T or F Periodic maintenance is work completed at specific intervals to prevent breakdowns and production inefficiency. | True |
T or F Project work may include rebuilding or modifying equipment. | True |
A plant ___ is a complete inventory and condition assessment of a facility's equipment and structure. | Survey |
___ monitoring is unscheduled equipment monitoring as required. | Equipment |
Visual and ___ inspection in the analysis of the appearance and sounds of operating equipment. | Auditory |
___ is the change in velocity. | Acceleration |
Quer criar seus próprios Flashcards gratuitos com GoConqr? Saiba mais.